swissnuclear Links & Downloads
Links & Downloads swissnuclear

Links and downloads

Further information

Links & Downloads swissnuclear

External specialists and partner organisations

Important links to organisations, power plants, associations and research institutions in the field of nuclear energy can be found here. 

Downloads

Important downloads relating to organisations, power plants, associations and research institutions in the field of nuclear energy can be found here. 

Document type
Select/Download
Document type
Topic
Select/Download
Topic
  • Cost Study 2026: Framework Report
  • MM: Cost study for 2026 submitted – financing of decommissioning and disposal on track
  • Cost study 2026: Determination of post-operational costs
  • Cost study 2026: Determination of decommissioning costs
  • Cost study 2026: Determining disposal costs – interim storage, transport, containers and reprocessing
  • Cost study 2026: Determination of disposal costs – Deep geological repository
  • Cost Study 2026: Glossary
  • Cost study 2021: Estimation of the decommissioning costs of Swiss nuclear power plants
  • MM: The Next Generation of Nuclear Energy Professionals: Interest in Training and Continuing Education Remains High
  • PR: Encouraging results from the STENFO funds
  • PR: International Nuclear Energy Conference in Zurich
  • RP: Interest in the "Nuclear Engineering" Master's programme remains high
  • PR: Change of leadership at swissnuclear
  • PR: A "yes" to technological openness and improved framework conditions for long-term operation
  • PR: International organisation recognises the safety standards and availability of Swiss nuclear power plants
  • PR: Swiss nuclear power plants generated 23.467 TWh of electricity in 2023
  • PR: Change of leadership at swissnuclear
  • PR: Important milestone on the path to a deep geological repository
  • 2021 Cost Study: Determination of post-operational costs for Swiss nuclear power plants
  • 2016 Cost Study: Abbreviations, terms, glossary
  • 2016 Cost Study: Estimate of the post-operational costs of Swiss nuclear power plants
  • 2016 cost study: Estimate of disposal costs - interim storage, transportation, containers and reprocessing
  • 2016 Cost Study: Estimate of the decommissioning costs of Swiss nuclear facilities
  • 2016 cost study: Estimate of disposal costs - deep geological disposal
  • 2016 Cost Study: Framework Report
  • Cost study 2021: Determination of disposal costs - Deep geological disposal
  • Cost study 2021: Determination of disposal costs - interim storage, transportation, containers and reprocessing
  • 2021 Cost Study: Abbreviations, terms, glossary
  • 2021 Cost Study: Framework Report
  • Fact sheet long-term operation

Internal links

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.